...

Statistics MATH-1410-6A (Spring 2013) Project 1 – Monthly Milk Production (Part 1)

by user

on
Category: Documents
1

views

Report

Comments

Transcript

Statistics MATH-1410-6A (Spring 2013) Project 1 – Monthly Milk Production (Part 1)
Statistics
MATH-1410-6A (Spring 2013)
Project 1 – Monthly Milk Production (Part 1)
Due: 3-17-2013
Worth: 8 points
Mr. Bennett, a dairy farmer near Des Moines Iowa, has volunteered to take part in a study conducted
by the Dairy Farmers of America. He has been asked to report the monthly milk production, in
pounds, of a random sample of 50 of the 400 Holstein cows currently on his farm.
Use the PHStat2 program to generate Mr. Bennett’s sample. Assume each cow on his farm has been
tagged with a number from 1 to 400. Once your sample has been generated, copy and paste your
results to a Word document and either e-mail me the document as an attachment to
[email protected] or hand in a hard copy by the above due date. A copy of what I would like
from you is shown below.
Fly UP